日本丰满大乳人妻无码苍井空,销魂美女图库,精品国产黑色丝袜高跟鞋,父亲动漫在线观看完整版动漫

濟南蓬發建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關信息發布和相關資訊,敬請關注!
新聞
聯系我們
咨詢電話
15866735826

聯系:張經理

手機: 15866735826

郵箱: 394441862@qq.com

網址:http://www.retraactit.com/

地址:山東省濟南市章丘圣井工業園

當前位置: 首頁 > 新聞中心 > 公司新聞

你認識木工加工棚嗎?

來源:http://www.retraactit.com/   發布時間:2023-02-02

木工加工棚采用標準鋼材,雙層防裂設計,結構牢固穩定。組裝齊全,便于運輸和基本安裝。它顏色鮮艷,外觀優雅。其產品尺寸和顏色可根據施工現場的實際要求定制。
The woodworking processing shed is made of national standard steel with double-layer anti-crack design and firm and stable structure. Completely assembled, convenient for transportation and basic installation. It has bright colors and elegant appearance. The product size and color can be customized according to the actual requirements of the construction site.
木工加工棚安裝說明:
Installation instructions for woodworking shed:
組件通過螺栓連接,瓷磚表面通過自攻釘連接。對大多數人來說,傳統手工木藝是噪音、空間和可操作性的公約數。當然,從另一個角度來看,傳統手工的緩慢有足夠的時間去觸摸和思考,并且不滿足于一個想法的實現,將木材制成成品的過程,然后慢慢加工成木工棚。
The components are connected by bolts, and the ceramic tile surface is connected by self-tapping screws. For most people, traditional handicraft carpentry is the common divisor of noise, space and operability. Of course, from another perspective, the slow pace of traditional handicrafts has enough time to touch and think, and is not satisfied with the realization of an idea. It is the process of making wood into finished products, and then slowly processing it into a wooden shed.
木工加工棚技術交底:
Safety technical disclosure of woodworking shed:
水平保護安裝和拆除前,進行技術交底。高空作業人員經過技術培訓和考試,并持證上崗。加工棚使用的鋼管、扣件等材料符合相關標準的要求。
Before installation and removal of horizontal protection, safety technical disclosure shall be conducted. High-altitude operators have received professional technical training and professional examination, and take up posts with certificates. The steel pipes, fasteners and other materials used in the processing shed meet the requirements of relevant standards.
安裝和拆除水平加工棚時,操作人員的“三寶”齊全并正確使用。加工棚搭設和拆除時,應避免上下同時作業,錯開作業時間。
When installing and removing the horizontal processing shed, the operator's "three treasures of safety" are complete and used correctly. When erecting and dismantling the processing shed, it is necessary to avoid simultaneous operation up and down and stagger the operation time.
木工加工棚
安裝和拆除加工棚時,所有材料和工具應堆放在建筑物外緣少2m處,堆放高度不得超過1m。拆除的材料及時傳遞到地面并運走,嚴禁高空拋擲。建造和拆除加工棚時,應在地面上設置警戒區,并派專人監控。
When installing and removing the processing shed, all materials and tools shall be stacked at least 2m away from the outer edge of the building, and the stacking height shall not exceed 1m. The dismantled materials shall be delivered to the ground and transported away in time. Throwing from high altitude is strictly prohibited. When constructing and dismantling the processing shed, a warning area should be set on the ground and a special person should be assigned to monitor it.
建造和拆除加工棚時,應指定專人指揮。管理人員應注意眼、腿、口,采取有效的防護措施應對危險情況,確保人員。
When constructing and dismantling the processing shed, a special person shall be assigned to command. The management personnel shall pay attention to the eyes, legs and mouth, and take effective safety protection measures to deal with dangerous situations to ensure personnel safety.
在雨天和大風天氣,應暫停加工棚的搭設和拆除,并檢查和維護加工棚的質量。加工棚搭設完成后,經專職員驗收合格后方可投入使用。在搭設和拆除水平防護前,進行技術交底。更多相關內容就來我們網站http://www.retraactit.com咨詢!
In rainy and windy weather, the erection and removal of the processing shed shall be suspended, and the quality of the processing shed shall be inspected and maintained. After the erection of the processing shed is completed, it can only be put into use after being accepted by the full-time safety officer. Before erecting and removing horizontal protection, safety technical disclosure shall be carried out. Come to our website for more relevant content http://www.retraactit.com consulting service