鋼筋加工棚從字面上來看,就知道是在施工現(xiàn)場內(nèi),對鋼筋進行拉直、彎曲、焊接等加工作業(yè)的場地。為了滿足施工需求,鋼筋加工棚一般布置在既方便進料、又在塔吊佳起重覆蓋范圍內(nèi),便于鋼筋的存放與加工,還方便后期出入庫搬運、吊運。那么搭設(shè)鋼筋加工棚,你需要知道哪些事?
The reinforcement processing shed literally means that it is the place where the reinforcement is straightened, bent, welded and other processing operations are carried out on the construction site. In order to meet the construction requirements, the reinforcement processing shed is generally arranged within the range of convenient feeding and tower crane, so as to facilitate the storage and processing of reinforcement, as well as the warehousing and transportation in the later period. So what do you need to know about setting up the steel bar processing shed?
現(xiàn)有技術(shù)的鋼筋加工棚一般為鋼管搭設(shè)式的,利用扣件將多根鋼管扣接搭設(shè)成加工棚的整體式鋼結(jié)構(gòu),每根連接加固鋼管的兩端分別固定在構(gòu)成鋼骨架的兩根鋼管之間,再在頂部鋪設(shè)一層彩鋼板,節(jié)點部位均采用螺栓連接,高度和長度可靈活調(diào)節(jié)、配制,并具有可拆卸性的特點,可長期循環(huán)利用。
The steel bar processing shed in the prior art is generally of the steel pipe erection type. A plurality of steel pipes are buckled and erected into an integral steel structure of the processing shed by using fasteners. The two ends of each connected and reinforced steel pipe are respectively fixed between the two steel pipes forming the steel skeleton, and then a layer of color steel plate is laid on the top. The nodes are connected by bolts. The height and length can be flexibly adjusted and configured, and are removable, which can be recycled for a long time.
然后在鋼結(jié)構(gòu)的四根鋼管橫梁上焊接多根豎直向鋼管,再用與鋼管橫梁平行的水平向鋼筋與同一排的豎直向鋼管通過扣件扣接固定,就構(gòu)成了防墜落保護欄桿,后掛上標語橫幅,整個鋼筋加工棚就施工完畢,通過高壓焊接,做到牢固不開焊,堅固耐用,靜電噴涂,防腐防銹,5年不褪色。
Then, several vertical steel pipes are welded on the four steel pipe beams of the steel structure, and then the horizontal steel bars parallel to the steel pipe beams are fastened with the vertical steel pipes in the same row through fasteners to form a fall protection railing. After that, a safety banner is hung, and the entire steel bar processing shed is completed. Through high-pressure welding, it is firm and durable, with electrostatic spraying, anti-corrosion and rust prevention, and it will not fade for 5 years.
鋼筋加工棚長和寬的尺寸,需要按照建筑施工防護標準進行設(shè)計,根據(jù)施工現(xiàn)場鋼筋加工數(shù)量和使用機械的多少來確定鋼筋加工棚的大小,一般需要根據(jù)施工計劃,安置鋼筋對焊機、切斷機、彎曲機、調(diào)直機等設(shè)備的數(shù)量及加工流水線;還需考慮部分鋼筋原材料、加工后鋼筋的周轉(zhuǎn)及堆放;以及現(xiàn)場施工場地、用電等條件來確定。
The length and width of the steel bar processing shed shall be designed according to the building construction protection standards. The size of the steel bar processing shed shall be determined according to the number of steel bars processed on the construction site and the number of machines used. Generally, the number of steel bar butt welding machines, cutting machines, bending machines, straightening machines and other equipment and processing lines shall be arranged according to the construction plan; It is also necessary to consider the turnover and stacking of some reinforcement raw materials and processed reinforcement; And the site construction site, electricity and other conditions.
所以鋼筋加工棚一般跨度在12~18m,,長度盡可能大于30m,一般情況有6*12m、9*12m等幾種,根據(jù)現(xiàn)場具體情況酌情采用,也可自行設(shè)計長寬尺寸,滿足24小時施工,有效節(jié)約施工成本。您有什么疑惑或者需求可以隨時來我們網(wǎng)站http://www.retraactit.com進行咨詢!
Therefore, the span of the reinforcement processing shed is generally 12~18m, and the length should be greater than 30m as much as possible. Generally, there are 6 * 12m, 9 * 12m and other types of sheds. They can be used according to the specific situation on site, or they can design their own length and width to meet the 24-hour construction requirements and effectively save construction costs. If you have any doubts or needs, you can come to our website at any time http://www.retraactit.com Consult!